Prices cover services
Listed amounts cover labour, coordination and project management. We agree the final price after the quantity survey and service-scope confirmation.
We lead complete apartment finishing, full renovations and commercial fit-outs. Design, cost planning, contractors, schedule and handover form one process.
An indicative price list for renovation and finishing services in Warsaw and surrounding areas. Expand a category to see the rates.
Listed amounts cover labour, coordination and project management. We agree the final price after the quantity survey and service-scope confirmation.
Concrete, reinforcement, membranes, adhesives, tiles, accessories, equipment and deliveries are outside service prices. The client purchases and pays for them separately.
For a complete project, we prepare a service estimate and schedule for the full scope. We do not mechanically add individual rates from the table.
Private-client service prices are gross. Business prices are net plus the applicable VAT.
Every project starts with a survey, a defined scope and a discussion of the finish standard. We then agree the contract model.
After analysis you receive a detailed service estimate, schedule and final price for execution work and project management. Changes to the service scope are agreed separately.
Service price in the contractYou see documented execution service costs. The Form & Finish fee is set after the project review; it is not charged on materials or on our own fee.
15–18% of service costsSelected model: Contract price for services
The initial call and preliminary estimate are free. We prepare detailed documentation as a separate stage before work begins.
From the discussion and available documents, we review the property type, intended scope, timing and indicative service cost.
PLN 0We prepare a detailed service scope, quantity survey, schedule, stages and a separate material list for the client.
PLN 3,875 + VATThe catalogue covers only labour, coordination and project management, set at approximately 80% of comparable Warsaw ranges. The client purchases and pays for materials, accessories, equipment and their deliveries outside this list. Standard services are shared by both client groups; only VAT presentation and specialist fit-out scope differ.
Houses, owner-occupied apartments and rental apartments. Table values are indicative gross service prices for consumers. Materials and equipment are excluded from service prices. *The final contract always states the gross price and VAT rate for the confirmed service scope.
Early budgets for labour, coordination and project management only. They exclude materials, accessories, equipment and deliveries, which the client pays for separately.
| Work | Unit | Gross price* |
|---|---|---|
| New-build apartment finish — basic scopeindicative labour for the whole apartment | m² | 940 PLN |
| New-build apartment finish — standard scopebathroom, walls, floors and typical service adjustments | m² | 1400 PLN |
| New-build apartment finish — extended scopemore service changes, built-ins and details | m² | 2060 PLN |
| Complete apartment renovation — basic scopelimited strip-out and minor service changes | m² | 1020 PLN |
| Complete apartment renovation — standard scopebathroom, kitchen, services, walls and floors | m² | 1660 PLN |
| Complete apartment renovation — extended scopemajor alterations, difficult substrates and bespoke work | m² | 2360 PLN |
| Bathroom renovation — standard scopelabour; final price depends on layout and fittings | room | 22 500 PLN |
| Bathroom renovation — demanding scopemajor service changes, large format or bespoke enclosures | room | 33 000 PLN |
Rates cover labour. Bags, skips, waste collection and protection of common areas may be priced as separate services. The client purchases materials for later work.
| Work | Unit | Gross price* |
|---|---|---|
| Wall tile removal | m² | 65 PLN |
| Floor tile removal | m² | 70 PLN |
| Tile removal in a small bathroom, recess or difficult area | m² | 90 PLN |
| Cement screed removal — standard thickness | m² | 85 PLN |
| Thick or reinforced floor removal | m² | 130 PLN |
| Floating floor panel removal | m² | 22 PLN |
| Glued floor panel removal | m² | 45 PLN |
| Skirting removal | lm | 18 PLN |
| Floor covering removal | m² | 27 PLN |
| Adhesive removal after floor coveringsconfirmed after an on-site test | m² | from 20 PLN |
| Wall plaster removal | m² | 55 PLN |
| Ceiling plaster removal | m² | 70 PLN |
| Light block or aerated concrete partition demolition | m² | 140 PLN |
| Brick or heavy masonry partition demolition | m² | 165 PLN |
| Light plasterboard partition or enclosure removal | m² | 70 PLN |
| Plasterboard suspended ceiling removal | m² | 90 PLN |
| Enlarging an opening in a non-loadbearing wallafter the wall type is confirmed | item | from 300 PLN |
| WC, basin or bidet removal | item | 260 PLN |
| Bath, shower tray or enclosure removal | item | 510 PLN |
| Door leaf and standard frame removal | set | 270 PLN |
| Old metal door frame removal | item | 410 PLN |
| Kitchen unit removal | item | 110 PLN |
| Complete fitted kitchen removal | set | from 500 PLN |
| Bagged debris carryingwaste collection and disposal excluded | bag | 45 PLN |
| Loading debris into a skip or bulk bag | scope | from 300 PLN |
Items cover typical partitions and making good after services. Structural elements require a technical assessment and separate design.
| Work | Unit | Gross price* |
|---|---|---|
| Block or silicate partition construction | m² | 135 PLN |
| Brick partition construction | m² | 180 PLN |
| Blocking up a doorway | item | 1220 PLN |
| Blocking up a small opening or recess | item | 690 PLN |
| Creating or enlarging a doorwaynon-loadbearing wall only | item | 1380 PLN |
| Reducing the width or height of a doorway | item | 790 PLN |
| Lintel in a non-loadbearing wall | item | 1210 PLN |
| Making good after electrical or plumbing work | lm | 80 PLN |
| Filling chases after cables and pipes | lm | 60 PLN |
| Making good damaged plaster | m² | 90 PLN |
| Hand-applied gypsum plaster | m² | 80 PLN |
| Hand-applied cement-lime plaster | m² | 90 PLN |
| Wall levelling before finishing | m² | 80 PLN |
| Floor substrate repair and levelling | m² | 70 PLN |
| Internal window board installation | lm | 165 PLN |
| Window board replacement with basic making good | lm | 230 PLN |
| Window or door reveal finishing | lm | 110 PLN |
| Full reveal making good after window replacement | window | 365 PLN |
| Vent grille installation in a prepared opening | item | 145 PLN |
| Access panel installation | item | 220 PLN |
| Wall or ceiling curtain rail installation | item | 200 PLN |
| TV bracket installation on a prepared wall | item | 315 PLN |
The rate depends on boarding layers, insulation, shape, height and the required paint-ready finish. Construction materials are priced separately.
| Work | Unit | Gross price* |
|---|---|---|
| Single-level plasterboard ceiling — simple construction | m² | 130 PLN |
| Two or multi-level plasterboard ceiling | m² | 200 PLN |
| Plasterboard ceiling with a bespoke shape | m² | 275 PLN |
| Additional acoustic ceiling insulation | m² | 70 PLN |
| Ceiling recess for LED lighting | lm | 185 PLN |
| Plasterboard curtain recess | lm | 165 PLN |
| LED profile installation in plasterboard | lm | 110 PLN |
| Plasterboard partition — single board, no infill | m² | 120 PLN |
| Plasterboard partition with mineral wool | m² | 150 PLN |
| Double-board plasterboard partition with mineral wool | m² | 195 PLN |
| Acoustic lining to an existing wall | m² | 140 PLN |
| Dot-and-dab plasterboard lining | m² | 75 PLN |
| Framing reinforcement for a TV or cabinets | location | 350 PLN |
| Service riser or pipe enclosure | lm | 205 PLN |
| Concealed WC frame enclosure | item | 550 PLN |
| WC frame enclosure with shelf or recess | item | 900 PLN |
| Bath enclosure in moisture-resistant board | item | 900 PLN |
| Moisture-resistant plasterboard enclosure | m² | 165 PLN |
| Plasterboard shelf construction | lm | 395 PLN |
| Access panel installation in plasterboard | item | 180 PLN |
| Plasterboard jointing and taping | lm | 32 PLN |
| Full plasterboard surface preparation for painting | m² | 50 PLN |
Rates assume a larger scope in an empty property at typical room heights. Repairs, protection and old coating removal are separate items.
| Work | Unit | Gross price* |
|---|---|---|
| Wall skim coat with sanding | m² | 65 PLN |
| Skim coat on new, even plaster | m² | 50 PLN |
| Ceiling skim coat with sanding | m² | 75 PLN |
| Mesh-reinforced skim coat | m² | 100 PLN |
| Priming before skim coating | m² | 11 PLN |
| White wall and ceiling painting — 2 coats | m² | 32 PLN |
| Coloured wall painting — 2 coats | m² | 37 PLN |
| Ceiling painting — 2 coats | m² | 37 PLN |
| Ceramic, latex or washable paint application | m² | 42 PLN |
| Priming before painting | m² | 13 PLN |
| Wall washing and degreasing | m² | 18 PLN |
| Wallpaper removal | m² | 35 PLN |
| Old or loose paint removal | m² | 36 PLN |
| Service pipe painting | lm | 28 PLN |
| Sectional radiator painting | section | 37 PLN |
| Door leaf painting — simple refresh | item | from 150 PLN |
| Spray painting large empty surfaces | m² | from 15 PLN |
Rates cover installation on a prepared substrate. Flooring, adhesives, underlays, skirting, profiles and levelling compound are separate materials.
| Work | Unit | Gross price* |
|---|---|---|
| Self-levelling screed beneath flooring | m² | 55 PLN |
| Substrate preparation for flooring | m² | 55 PLN |
| Click laminate — simple layout | m² | 60 PLN |
| Laminate — difficult layout or extensive cutting | m² | 80 PLN |
| Herringbone laminate | m² | 100 PLN |
| Click vinyl flooring | m² | 65 PLN |
| Glue-down vinyl flooring | m² | 90 PLN |
| Herringbone vinyl flooring | m² | 130 PLN |
| Floating engineered timber flooring | m² | 90 PLN |
| Glue-down engineered timber flooring | m² | 135 PLN |
| Flooring underlay installation | m² | 16 PLN |
| Vapour barrier installation | m² | 13 PLN |
| Standard MDF skirting installation | lm | 40 PLN |
| High or lacquered MDF skirting installation | lm | 63 PLN |
| Polyurethane or duropolymer skirting installation | lm | 70 PLN |
| Aluminium skirting installation | lm | 65 PLN |
| Acrylic sealing above skirting | lm | 22 PLN |
| Threshold and transition profile installation | item | 140 PLN |
Rates depend on format, cuts, corners, holes and substrate condition. Tiles, adhesives, waterproofing products and trims are separate materials.
| Work | Unit | Gross price* |
|---|---|---|
| Wall tiles up to approximately 60 × 60 cm | m² | 180 PLN |
| Floor porcelain tiles up to approximately 60 × 60 cm | m² | 200 PLN |
| Diagonal or offset tile layout | m² | 220 PLN |
| Large-format tiles — standard layout | m² | 320 PLN |
| Large-format porcelain or difficult format | m² | 365 PLN |
| Mosaic installation | m² | 405 PLN |
| Sintered stone installation | m² | 630 PLN |
| 45-degree tile edge mitring | lm | 145 PLN |
| Hole cutting in tile or porcelain | item | 80 PLN |
| Tile trim installation | lm | 62 PLN |
| Pre-cut tile skirting installation | lm | 70 PLN |
| Cut tile skirting installation | lm | 110 PLN |
| Silicone sealing to corners and joints | lm | 31 PLN |
| Priming the substrate before tiling | m² | 14 PLN |
| Bathroom waterproofing | m² | 80 PLN |
| Substrate levelling before tiling | m² | 80 PLN |
| Linear drain installation | item | 1310 PLN |
| Shower tray installation | item | 1050 PLN |
| Standard shower enclosure installation | item | 1060 PLN |
| Walk-in shower screen installation | item | 1040 PLN |
| Tiled bath enclosure | item | 1580 PLN |
Rates assume correctly prepared connections. Service alterations, drilling difficult porcelain and bespoke fittings are priced separately.
| Work | Unit | Gross price* |
|---|---|---|
| Close-coupled WC installation | item | 400 PLN |
| Concealed WC frame installation | item | 780 PLN |
| Wall-hung WC pan installation | item | 445 PLN |
| Complete concealed WC set installation | set | 1060 PLN |
| Wall-hung or countertop basin installation | item | 395 PLN |
| Vanity unit and basin installation | item | 620 PLN |
| Deck-mounted basin tap installation | item | 250 PLN |
| Exposed bath or shower mixer installation | item | 310 PLN |
| Concealed mixer or shower set installation | item | 850 PLN |
| Bath installation to prepared connections | item | 870 PLN |
| Bath screen installation | item | 410 PLN |
| Bathroom mirror installation | item | 430 PLN |
| LED bathroom mirror installation | item | 610 PLN |
| Bathroom cabinet installation | item | 520 PLN |
| Bathroom shelf or accessory installation | item | 135 PLN |
| Complete bathroom sanitaryware installationtypical fitting set; service alterations excluded | scope | 3160 PLN |
Rates cover labour. Cables, boxes, protection devices, boards, accessories and light fittings are separate materials. Chases in reinforced concrete carry a separate rate.
| Work | Unit | Gross price* |
|---|---|---|
| New electrical point including cable run | point | 200 PLN |
| New electrical point without chasing | point | 150 PLN |
| Electrical point relocation with chasing | point | 200 PLN |
| Socket installation or replacement at an existing point | item | 72 PLN |
| Light switch installation or replacement | item | 90 PLN |
| Two-way or intermediate switch installation | item | 110 PLN |
| USB / USB-C socket installation | item | 185 PLN |
| Simple smart module installation | point | 160 PLN |
| 400 V outlet installation | item | 325 PLN |
| Simple ceiling light installation | item | 135 PLN |
| Wall light installation | item | 145 PLN |
| Standard pendant light installation | item | 270 PLN |
| Heavy or bespoke chandelier installation | item | 540 PLN |
| LED downlight installation in a suspended ceiling | item | 72 PLN |
| Lighting track installation | lm | 140 PLN |
| Light fitting on an existing track | item | 80 PLN |
| LED strip installation in an aluminium profile | lm | 75 PLN |
| LED driver, controller or dimmer installation | item | 225 PLN |
| Under-cabinet kitchen LED set installation | set | 290 PLN |
| Mirror lighting connection | item | 260 PLN |
| Bathroom extractor fan installation | item | 230 PLN |
| Induction hob connection to a prepared circuit | item | 370 PLN |
| Dedicated induction hob supply | circuit | 890 PLN |
| Oven connection to a prepared point | item | 275 PLN |
| New LAN / TV / SAT point including cable run | point | 205 PLN |
| Floor box installation to a prepared supply | item | 600 PLN |
| Blind or shutter power point | point | 325 PLN |
| Distribution board up to approximately 24 modules | item | 1100 PLN |
| Distribution board device installation | module | 50 PLN |
| Chasing in plaster, brick or aerated concrete | lm | 45 PLN |
| Chasing in concrete or reinforced concrete | lm | 90 PLN |
| Making good electrical chases | lm | 45 PLN |
| Intercom installation to existing wiring | item | 450 PLN |
| Video intercom installation to prepared wiring | item | 800 PLN |
| Motion or dusk sensor installation | item | 225 PLN |
| Smoke or heat detector installation | item | 275 PLN |
Rates depend on route lengths, wall construction, riser access and pipe diameters. Installation materials and equipment are priced separately.
| Work | Unit | Gross price* |
|---|---|---|
| New water and waste point | point | 540 PLN |
| New water point without waste | point | 360 PLN |
| Existing water and waste point alteration | point | 580 PLN |
| Water point relocation | point | 620 PLN |
| Waste point relocation | point | 800 PLN |
| Basin connections | item | 530 PLN |
| Close-coupled WC connections | item | 540 PLN |
| Concealed WC frame connections | item | 800 PLN |
| Shower or bath connections | item | 710 PLN |
| Washing machine or dishwasher connections | item | 530 PLN |
| Water point for a refrigerator | item | 410 PLN |
| Floor drain installation | item | 740 PLN |
| Linear drain with waste connection | item | 1320 PLN |
| Service alteration for a concealed mixer | item | 1050 PLN |
| Main isolation valve replacement | item | 460 PLN |
| Line filter or pressure reducer installation | item | 460 PLN |
| Chase for water or waste pipes | lm | 80 PLN |
| Concrete chase for plumbing | lm | 130 PLN |
| Making good plumbing chases | lm | 60 PLN |
| Appliance connection to prepared services | item | 350 PLN |
| Water installation pressure test | scope | 490 PLN |
| Radiator connections | point | 370 PLN |
| Panel radiator installation to prepared connections | item | 370 PLN |
| Bathroom or decorative radiator installation | item | 460 PLN |
| Radiator point relocation | item | 740 PLN |
| Radiator valve replacement | item | 270 PLN |
| Wet underfloor heating pipe installation | m² | 85 PLN |
| Underfloor heating manifold installation | item | 840 PLN |
| Underfloor heating loop balancing | loop | 110 PLN |
Architectural design and specialist technologies are scoped for the complete project. Listed prices cover design or execution services. The client pays separately for specialist products and materials.
| Work | Unit | Gross price* |
|---|---|---|
| Interior concept with an architectproject minimum applies after briefing | m² | from 150 PLN |
| Technical interior design with an architectdrawing package agreed before quotation | m² | from 200 PLN |
| Architect site supervision | visit | from 400 PLN |
| Microcement system applicationsystem material and substrate preparation are the client’s cost | m² | After sample and quotation |
| Decorative concrete — simple effect | m² | 200 PLN |
| Decorative concrete — complex texture | m² | 275 PLN |
| Venetian plaster — simple effect | m² | 290 PLN |
| Venetian plaster with marble or polished effect | m² | 410 PLN |
| Decorative travertine — simple surface | m² | 275 PLN |
| Decorative plaster — simple textured effect | m² | 145 PLN |
| Decorative plaster — special effect | m² | 270 PLN |
| Rust, metal, patina or aged wall effect | m² | 310 PLN |
| Concealed frame door installationopening preparation and wall finishing excluded | item | 750 PLN |
Offices, shops and service premises. Standard services — from strip-out to installations — follow the same scope as above, without duplicating the catalogue. A business quote presents them net plus the applicable VAT. Materials and equipment remain the client’s cost. Only specialist fit-out services appear below.
Commercial rates are net and cover services only. The client purchases and pays for materials, equipment, accessories and deliveries. Systems that depend on engineering documentation receive a service price after design.
| Service | Unit | Net price |
|---|---|---|
| Carpet installation | m² | PLN 52 net |
| Commercial welded PVC flooring installation | m² | PLN 72 net |
| Mineral tile ceiling — standard grid installationthe client purchases tiles, grid components and ceiling services | m² | from PLN 150 net |
| System glazed partition installationthe client purchases glass and the fixing system | m² | After documentation |
| Cassette air conditioner installationup to 10 kW and 3 lm of installation; the client purchases the unit, pipework and accessories | unit | from PLN 1,900 net |
| New structured LAN point | point | from PLN 205 net |
| Electrical testing — premises up to 70 m² | scope | from PLN 435 net |
| HVAC and ventilation | system | After design |
| Fire protection systems | system | After design |
| Structured cabling and network | system | After design |
| Technical lighting and controls | system | After design |
| Commercial cabinetry and joinery installationthe client purchases the furniture and joinery elements | set | After design |
| Signage and wayfinding installationthe client purchases signage elements | set | After design |
| Technical testing and handover | scope | After design |
The same service scope can produce a different price and division of risk depending on the contract model. Material costs are excluded from this example.
The contract-price variant assumes the full PLN 500,000 is the cost of services included in the agreement. 500,000 ÷ 0.75 ≈ 666,667. The client pays separately for materials, accessories, equipment and deliveries; they are excluded from these figures and from the Open Book fee base. This is an arithmetic illustration, not an offer.
No. Both models cover services only: execution work, coordination and project management. The client purchases and pays for materials, accessories, equipment and deliveries.
No. Open Book shows execution service costs and a fixed percentage management fee. Material purchase prices are excluded from the 15–18% base.
Before extra work starts we show the service description, its price and schedule impact. Any change to the contract service price needs agreement.
Form & Finish is the general contractor and one point of responsibility. We select subcontractors, coordinate them, control quality and manage handover.
No. Architect collaboration and individual trades are provided within complete apartment or premises delivery.
Share the location, size and project stage. We will suggest the next step.